Group of 7 countries (G7): Government > Red tape > Time required to get electricity stats

Definitions

  • Days: Time required to get electricity (days). Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure.
  • Days per million: Time required to get electricity (days). Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure. Figures expressed per million population for the same year.
STAT G7 TOTAL G7 AVERAGE DATES
Days 653
3% of surveyed countries
93.29
18% less than average
2013
Days per million 1.46
83 times less than average
2012

Citation

Adblocker detected! Please consider reading this notice.

We've detected that you are using AdBlock Plus or some other adblocking software which is preventing the page from fully loading.

We don't have any banner, Flash, animation, obnoxious sound, or popup ad. We do not implement these annoying types of ads!

We need money to operate the site, and almost all of it comes from our online advertising.

Please add www.nationmaster.com to your ad blocking whitelist or disable your adblocking software.

×