×

Former Spanish colonies Compared by Energy > Delay in obtaining an electrical connection > Days per million

DEFINITION: Delay in obtaining an electrical connection (days). Delay in obtaining an electrical connection is the average wait, in days, experienced to obtain an electrical connection from the day an establishment applies for it to the day it receives the service. Figures expressed per million population for the same year.

CONTENTS

# COUNTRY AMOUNT DATE GRAPH HISTORY
1 Costa Rica 8.35 2010
2 El Salvador 4.6 2010
3 Uruguay 4.6 2010
4 Nicaragua 4.24 2010
5 Paraguay 3.59 2010
6 Honduras 3.06 2010
7 Dominican Republic 2.41 2010
8 Bolivia 2.09 2010
9 Argentina 1.34 2010
10 Guatemala 1.24 2010
11 Chile 1.23 2010
12 Peru 1.14 2010
13 Ecuador 0.713 2010
14 Panama 0.489 2010
15 Venezuela 0.479 2010
16 Colombia 0.45 2010
17 Philippines 0.251 2009
18 Mexico 0.145 2010

Citation

Former Spanish colonies Compared by Energy > Delay in obtaining an electrical connection > Days per million

NationMaster

Interesting observations about Energy > Delay in obtaining an electrical connection > Days per million

  • 7 of the top 10 countries by delay in obtaining an electrical connection > days per million are Hot countries.
  • China has ranked last for delay in obtaining an electrical connection > days per million since 2003.
  • All of the bottom 2 countries by delay in obtaining an electrical connection > days per million are Emerging markets'.
  • Sri Lanka has ranked in the top 4 for delay in obtaining an electrical connection > days per million since 2004.
  • Zambia has ranked in the top 4 for delay in obtaining an electrical connection > days per million since 2002.
  • 29 of the top 87 countries by delay in obtaining an electrical connection > days per million are Landlocked.
  • 18 of the top 56 countries by delay in obtaining an electrical connection > days per million are European.
  • Albania has ranked in the top 5 for delay in obtaining an electrical connection > days per million since 2002.
  • Russia ranked last for delay in obtaining an electrical connection > days per million amongst Former Soviet republics in 2012.
  • Cape Verde has ranked in the top 5 for delay in obtaining an electrical connection > days per million since 2006.
  • Turkey ranked second last for delay in obtaining an electrical connection > days per million amongst Non-religious countries in 2008.
Follow us on Facebook to get interesting stats:

Adblocker detected! Please consider reading this notice.

We've detected that you are using AdBlock Plus or some other adblocking software which is preventing the page from fully loading.

We don't have any banner, Flash, animation, obnoxious sound, or popup ad. We do not implement these annoying types of ads!

We need money to operate the site, and almost all of it comes from our online advertising.

Please add www.nationmaster.com to your ad blocking whitelist or disable your adblocking software.

×