Zambia - Time Needed to Deal with Construction Permits
Since 2015, Zambia Time Needed to Deal with Construction Permits showed no change. In 2020, the country was number 77 comparing other countries in Time Needed to Deal with Construction Permits at 611 Days. Zambia is overtaken by Lesotho, which was number 76 with 615 Days and is followed by Democratic Republic of the Congo at 610 Days. Guinea-Bissau topped the ranking with 1,785 Days in 2020, stable versus 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey recorded the best 5 years average growth at +6.8% per year, while Niger witnessed the worst performance at -7% per year.
Loading...
Date | Days |
---|---|
2020 | 611.00 |
2019 | 611.00 |
2018 | 611.00 |
2017 | 611.00 |
2016 | 611.00 |
Download all data from 2004 to 2020
How does Zambia rank in Time Needed to Deal with Construction Permits?
# | 187 Countries | Days | Last | YoY | 5‑years CAGR | ||
---|---|---|---|---|---|---|---|
1 |
#1
Guinea-Bissau
|
1,785.00 | 2020 | +0.0 % | +0.0 % | View data | |
2 |
#2
Suriname
|
1,715.00 | 2020 | +0.0 % | +0.0 % | View data | |
76 |
#76
Lesotho
|
615.00 | 2020 | +0.0 % | +0.0 % | View data | |
77 |
#77
Zambia
|
611.00 | 2020 | +0.0 % | +0.0 % | View data | |
78 |
#78
Democratic Republic of the Congo
|
610.00 | 2020 | +0.0 % | +0.0 % | View data |