Vanuatu - Time Needed to Deal with Construction Permits
Since 2015, Vanuatu Time Needed to Deal with Construction Permits remained stable. In 2020, the country was ranked number 151 among other countries in Time Needed to Deal with Construction Permits at 430 Days. Guinea-Bissau lead the ranking with 1,785 Days in 2020, that is stable versus 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey recorded the best 5 years average growth at +6.8% per year, while Niger witnessed the worst performance at -7% per year.
Loading...
Date | Days |
---|---|
2020 | 430.00 |
2019 | 430.00 |
2018 | 430.00 |
2017 | 430.00 |
2016 | 430.00 |
Download all data from 2004 to 2020
How does Vanuatu rank in Time Needed to Deal with Construction Permits?
# | 187 Countries | Days | Last | YoY | 5‑years CAGR | ||
---|---|---|---|---|---|---|---|
1 |
#1
Guinea-Bissau
|
1,785.00 | 2020 | +0.0 % | +0.0 % | View data | |
2 |
#2
Suriname
|
1,715.00 | 2020 | +0.0 % | +0.0 % | View data | |
151 |
#151
Tajikistan
|
430.00 | 2020 | +0.0 % | +0.0 % | View data | |
151 |
#151
Vanuatu
|
430.00 | 2020 | +0.0 % | +0.0 % | View data | |
153 |
#153
Cape Verde
|
425.00 | 2020 | +0.0 % | +0.0 % | View data |