Tunisia - Time Needed to Deal with Construction Permits

Since 2015, Tunisia Time Needed to Deal with Construction Permits remained stable. At 565 Days in 2020, the country was ranked number 99 among other countries in Time Needed to Deal with Construction Permits. Tunisia is overtaken by Kuwait, which was number 98 with 566 Days and is followed by Bulgaria with 564 Days. Guinea-Bissau topped the ranking with 1,785 Days in 2020, stable versus 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey recorded the best 5 years average growth at +6.8% per year, while Niger recorded the worst performance at -7% per year.

Loading...

Date Days
2020 565.00
2019 565.00
2018 565.00
2017 565.00
2016 565.00
Download all data from 2004 to 2020

How does Tunisia rank in Time Needed to Deal with Construction Permits?

# 187 Countries Days Last YoY 5‑years CAGR
1 #1
Guinea-Bissau
1,785.00 2020 +0.0 % +0.0 % View data
2 #2
Suriname
1,715.00 2020 +0.0 % +0.0 % View data
98 #98
Kuwait
566.00 2020 +0.0 % +0.0 % View data
99 #99
Tunisia
565.00 2020 +0.0 % +0.0 % View data
100 #100
Bulgaria
564.00 2020 +0.0 % +0.0 % View data
Compare all 187 countries

Go Top