Tunisia - Time Needed to Deal with Construction Permits
Since 2015, Tunisia Time Needed to Deal with Construction Permits remained stable. At 565 Days in 2020, the country was ranked number 99 among other countries in Time Needed to Deal with Construction Permits. Tunisia is overtaken by Kuwait, which was number 98 with 566 Days and is followed by Bulgaria with 564 Days. Guinea-Bissau topped the ranking with 1,785 Days in 2020, stable versus 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey recorded the best 5 years average growth at +6.8% per year, while Niger recorded the worst performance at -7% per year.
Loading...
Date | Days |
---|---|
2020 | 565.00 |
2019 | 565.00 |
2018 | 565.00 |
2017 | 565.00 |
2016 | 565.00 |
Download all data from 2004 to 2020
How does Tunisia rank in Time Needed to Deal with Construction Permits?
# | 187 Countries | Days | Last | YoY | 5‑years CAGR | ||
---|---|---|---|---|---|---|---|
1 |
#1
Guinea-Bissau
|
1,785.00 | 2020 | +0.0 % | +0.0 % | View data | |
2 |
#2
Suriname
|
1,715.00 | 2020 | +0.0 % | +0.0 % | View data | |
98 |
#98
Kuwait
|
566.00 | 2020 | +0.0 % | +0.0 % | View data | |
99 |
#99
Tunisia
|
565.00 | 2020 | +0.0 % | +0.0 % | View data | |
100 |
#100
Bulgaria
|
564.00 | 2020 | +0.0 % | +0.0 % | View data |