Serbia - Time Needed to Deal with Construction Permits

Since 2015, Serbia Time Needed to Deal with Construction Permits decreased by 0.4% year on year. In 2020, the country was ranked number 73 comparing other countries in Time Needed to Deal with Construction Permits with 622 Days. Serbia is overtaken by Turkey, which was number 72 with 623 Days and is followed by Mali at 620 Days. Guinea-Bissau topped the ranking with 1,785 Days in 2020, that is stable compared to 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey witnessed the best average annual growth at +6.8% per year, while Niger was the worst growing country at -7% per year.

Loading...

Date Days
2020 622.00
2019 635.00
2018 635.00
2017 635.00
2016 635.00
Download all data from 2004 to 2020

How does Serbia rank in Time Needed to Deal with Construction Permits?

# 187 Countries Days Last YoY 5‑years CAGR
1 #1
Guinea-Bissau
1,785.00 2020 +0.0 % +0.0 % View data
2 #2
Suriname
1,715.00 2020 +0.0 % +0.0 % View data
72 #72
Turkey
623.00 2020 +2.3 % +6.8 % View data
73 #73
Serbia
622.00 2020 -2.0 % -0.4 % View data
74 #74
Mali
620.00 2020 +0.0 % +0.0 % View data
Compare all 187 countries

Go Top