Philippines - Time Needed to Deal with Construction Permits

Since 2015, Philippines Time Needed to Deal with Construction Permits remained stable. In 2020, the country was number 23 comparing other countries in Time Needed to Deal with Construction Permits with 962 Days. Philippines is overtaken by Israel, which was ranked number 22 with 975 Days and is followed by Swaziland with 956 Days. Guinea-Bissau topped the ranking with 1,785 Days in 2020, stable versus 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey recorded the best 5 years average growth at +6.8% per year, while Niger witnessed the worst performance at -7% per year.

Loading...

Date Days
2020 962.00
2019 962.00
2018 962.00
2017 962.00
2016 962.00
Download all data from 2004 to 2020

How does Philippines rank in Time Needed to Deal with Construction Permits?

# 187 Countries Days Last YoY 5‑years CAGR
1 #1
Guinea-Bissau
1,785.00 2020 +0.0 % +0.0 % View data
2 #2
Suriname
1,715.00 2020 +0.0 % +0.0 % View data
22 #22
Israel
975.00 2020 +0.0 % +0.0 % View data
23 #23
Philippines
962.00 2020 +0.0 % +0.0 % View data
24 #24
Swaziland
956.00 2020 +0.0 % +0.0 % View data
Compare all 187 countries

Go Top