Mozambique - Time Needed to Deal with Construction Permits

Since 2015, Mozambique Time Needed to Deal with Construction Permits remained stable. With 950 Days in 2020, the country was number 25 comparing other countries in Time Needed to Deal with Construction Permits. Mozambique is overtaken by Swaziland, which was number 24 with 956 Days and is followed by Honduras with 920 Days. Guinea-Bissau topped the ranking with 1,785 Days in 2020, stable versus 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey witnessed the best average annual growth at +6.8% per year, while Niger witnessed the worst performance at -7% per year.

Loading...

Date Days
2020 950.00
2019 950.00
2018 950.00
2017 950.00
2016 950.00
Download all data from 2004 to 2020

How does Mozambique rank in Time Needed to Deal with Construction Permits?

# 187 Countries Days Last YoY 5‑years CAGR
1 #1
Guinea-Bissau
1,785.00 2020 +0.0 % +0.0 % View data
2 #2
Suriname
1,715.00 2020 +0.0 % +0.0 % View data
24 #24
Swaziland
956.00 2020 +0.0 % +0.0 % View data
25 #25
Mozambique
950.00 2020 +0.0 % +0.0 % View data
26 #26
Honduras
920.00 2020 +0.0 % +0.0 % View data