Lithuania - Sold Production of Electrical Signalling, Safety or Traffic Control Equipment for Railways or Tramways
Since 2014, Lithuania Sold Production of Electrical Signalling, Safety or Traffic Control Equipment for Railways or Tramways was up 17.9% year on year. In 2019, the country was ranked number 24 comparing other countries in Sold Production of Electrical Signalling, Safety or Traffic Control Equipment for Railways or Tramways with €381,767. Lithuania is overtaken by Croatia, which was number 23 at €4,523,492.91 and is followed by Finland at €225,098.26. Germany topped the ranking with €799,598,316.22 in 2019, a decrease of 1.4% versus 2018. Germany, Austria and France respectively ranked number 2, 3 and 4 in this ranking. Poland witnessed the best average annual growth at +38.4% per year, while Estonia recorded the worst performance at -60.1% per year.
Loading...
Date | Euros |
---|---|
2019 | 381,767.00 |
2018 | 341,640.00 |
2017 | 363,447.00 |
2016 | 413,540.00 |
2015 | 474,161.00 |
How does Lithuania rank in Sold Production of Electrical Signalling, Safety or Traffic Control Equipment for Railways or Tramways?
# | 28 Countries | Euros | Last | YoY | 5‑years CAGR | ||
---|---|---|---|---|---|---|---|
1 |
#1
Germany
|
799,598,316.22 | 2019 | -1.4 % | +4.9 % | View data | |
3 |
#3
Austria
|
476,489,577.40 | 2019 | +1.5 % | -0.9 % | View data | |
21 |
#21
Hungary
|
7,353,636.30 | 2019 | -5.9 % | -7.2 % | View data | |
24 |
#24
Lithuania
|
381,767.00 | 2019 | +11.8 % | +17.9 % | View data | |
26 |
#26
Portugal
|
116,310.00 | 2019 | -22.8 % | NA | View data |