Iraq - Time Needed to Deal with Construction Permits

Since 2015, Iraq Time Needed to Deal with Construction Permits remained stable. At 520 Days in 2020, the country was ranked number 114 comparing other countries in Time Needed to Deal with Construction Permits. Iraq is overtaken by Malawi, which was number 113 at 522 Days and is followed by Chile at 519 Days. Guinea-Bissau topped the ranking with 1,785 Days in 2020, stable compared to 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey witnessed the best average annual growth at +6.8% per year, while Niger recorded the worst performance at -7% per year.

Loading...

Date Days
2020 520.00
2019 520.00
2018 520.00
2017 520.00
2016 520.00
Download all data from 2005 to 2020

How does Iraq rank in Time Needed to Deal with Construction Permits?

# 187 Countries Days Last YoY 5‑years CAGR
1 #1
Guinea-Bissau
1,785.00 2020 +0.0 % +0.0 % View data
2 #2
Suriname
1,715.00 2020 +0.0 % +0.0 % View data
113 #113
Malawi
522.00 2020 +0.0 % +3.9 % View data
114 #114
Iraq
520.00 2020 +0.0 % +0.0 % View data
115 #115
Chile
519.00 2020 -0.4 % -0.1 % View data