Guinea - Time Needed to Deal with Construction Permits

Since 2015, Guinea Time Needed to Deal with Construction Permits showed no change. At 311 Days in 2020, the country was ranked number 177 comparing other countries in Time Needed to Deal with Construction Permits. Guinea is overtaken by Luxembourg, which was number 176 at 321 Days and is followed by South Korea with 290 Days. Guinea-Bissau ranked the highest with 1,785 Days in 2020, stable compared to 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey witnessed the best average annual growth at +6.8% per year, while Niger recorded the worst performance at -7% per year.

Loading...

Date Days
2020 311.00
2019 311.00
2018 311.00
2017 311.00
2016 311.00
Download all data from 2004 to 2020

How does Guinea rank in Time Needed to Deal with Construction Permits?

# 187 Countries Days Last YoY 5‑years CAGR
1 #1
Guinea-Bissau
1,785.00 2020 +0.0 % +0.0 % View data
2 #2
Suriname
1,715.00 2020 +0.0 % +0.0 % View data
176 #176
Luxembourg
321.00 2020 +0.0 % +0.0 % View data
177 #177
Guinea
311.00 2020 +0.0 % +0.0 % View data
178 #178
South Korea
290.00 2020 +0.0 % +0.0 % View data
Compare all 187 countries

Go Top