Georgia - Time Needed to Deal with Construction Permits
Since 2015, Georgia Time Needed to Deal with Construction Permits remained stable. With 285 Days in 2020, the country was ranked number 179 comparing other countries in Time Needed to Deal with Construction Permits. Georgia is overtaken by South Korea, which was number 178 at 290 Days and is followed by Azerbaijan at 277 Days. Guinea-Bissau lead the ranking with 1,785 Days in 2020, that is stable compared to 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey witnessed the best average annual growth at +6.8% per year, while Niger witnessed the worst performance at -7% per year.
Loading...
Date | Days |
---|---|
2020 | 285.00 |
2019 | 285.00 |
2018 | 285.00 |
2017 | 285.00 |
2016 | 285.00 |
Download all data from 2004 to 2020
How does Georgia rank in Time Needed to Deal with Construction Permits?
# | 187 Countries | Days | Last | YoY | 5‑years CAGR | ||
---|---|---|---|---|---|---|---|
1 |
#1
Guinea-Bissau
|
1,785.00 | 2020 | +0.0 % | +0.0 % | View data | |
2 |
#2
Suriname
|
1,715.00 | 2020 | +0.0 % | +0.0 % | View data | |
178 |
#178
South Korea
|
290.00 | 2020 | +0.0 % | +0.0 % | View data | |
179 |
#179
Georgia
|
285.00 | 2020 | +0.0 % | +0.0 % | View data | |
180 |
#180
Azerbaijan
|
277.00 | 2020 | +0.0 % | +0.0 % | View data |