Equatorial Guinea - Time Needed to Deal with Construction Permits

Since 2015, Equatorial Guinea Time Needed to Deal with Construction Permits remained stable. In 2020, the country was ranked number 141 among other countries in Time Needed to Deal with Construction Permits at 475 Days. Equatorial Guinea is overtaken by Antigua and Barbuda, which was ranked number 140 with 476 Days and is followed by Latvia with 469 Days. Guinea-Bissau lead the ranking with 1,785 Days in 2020, that is stable compared to 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey witnessed the best average annual growth at +6.8% per year, while Niger was the worst growing country at -7% per year.

Loading...

Date Days
2020 475.00
2019 475.00
2018 475.00
2017 475.00
2016 475.00
Download all data from 2006 to 2020

How does Equatorial Guinea rank in Time Needed to Deal with Construction Permits?

# 187 Countries Days Last YoY 5‑years CAGR
1 #1
Guinea-Bissau
1,785.00 2020 +0.0 % +0.0 % View data
2 #2
Suriname
1,715.00 2020 +0.0 % +0.0 % View data
140 #140
Antigua and Barbuda
476.00 2020 +0.0 % +0.0 % View data
141 #141
Equatorial Guinea
475.00 2020 +0.0 % +0.0 % View data
142 #142
Latvia
469.00 2020 +0.0 % +0.0 % View data
Compare all 187 countries

Go Top