Czech Republic - Time Needed to Deal with Construction Permits
Since 2015, Czech Republic Time Needed to Deal with Construction Permits showed no change. In 2020, the country was number 57 comparing other countries in Time Needed to Deal with Construction Permits with 678 Days. Czech Republic is overtaken by Poland, which was ranked number 56 at 685 Days and is followed by Kiribati with 660 Days. Guinea-Bissau ranked the highest with 1,785 Days in 2020, stable versus 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey recorded the best 5 years average growth at +6.8% per year, while Niger witnessed the worst performance at -7% per year.
Loading...
Date | Days |
---|---|
2020 | 678.00 |
2019 | 678.00 |
2018 | 678.00 |
2017 | 678.00 |
2016 | 678.00 |
Download all data from 2004 to 2020
How does Czech Republic rank in Time Needed to Deal with Construction Permits?
# | 187 Countries | Days | Last | YoY | 5‑years CAGR | ||
---|---|---|---|---|---|---|---|
1 |
#1
Guinea-Bissau
|
1,785.00 | 2020 | +0.0 % | +0.0 % | View data | |
2 |
#2
Suriname
|
1,715.00 | 2020 | +0.0 % | +0.0 % | View data | |
56 |
#56
Poland
|
685.00 | 2020 | +0.0 % | +0.0 % | View data | |
57 |
#57
Czech Republic
|
678.00 | 2020 | +0.0 % | +0.0 % | View data | |
58 |
#58
Botswana
|
660.00 | 2020 | +0.0 % | +0.0 % | View data |