Nigeria - Time Needed to Deal with Construction Permits

Over the last 5 years, Nigeria Time Needed to Deal with Construction Permits showed no change. Last year, the country was ranked number 131 comparing other countries in Time Needed to Deal with Construction Permits at 110.2 Days. Nigeria is overtaken by Norway, which was number 130 at 110.5 Days and is followed by Cabo Verde with 108 Days. Cambodia lead the ranking with 652 Days in 2019, that is stable versus 2018. Cyprus, Barbados and Venezuela respectively ranked number 2, 3 and 4 in this ranking. El Salvador recorded the best 5 years average growth at +21.2% per year, while Serbia recorded the worst performance at -20% per year.

Loading...

Date Days
2019 110.20
2018 110.20
2017 110.20
2016 110.20
2015 110.20
Download all data from 2014 to 2019

How does Nigeria rank in Time Needed to Deal with Construction Permits?

# 185 Countries Days Last YoY 5‑years CAGR
1 #1
Cambodia
652.00 2019 +0.0 % +0.0 % View data
2 #2
Cyprus
507.00 2019 +0.0 % -5.6 % View data
130 #130
Norway
110.50 2019 +0.0 % +0.0 % View data
131 #131
Nigeria
110.20 2019 +0.0 % +0.0 % View data
132 #132
Cabo Verde
108.00 2019 +0.0 % +0.0 % View data
Compare all 185 countries

Go Top