Nigeria - Time Needed to Deal with Construction Permits
Over the last 5 years, Nigeria Time Needed to Deal with Construction Permits showed no change. Last year, the country was ranked number 131 comparing other countries in Time Needed to Deal with Construction Permits at 110.2 Days. Nigeria is overtaken by Norway, which was number 130 at 110.5 Days and is followed by Cabo Verde with 108 Days. Cambodia lead the ranking with 652 Days in 2019, that is stable versus 2018. Cyprus, Barbados and Venezuela respectively ranked number 2, 3 and 4 in this ranking. El Salvador recorded the best 5 years average growth at +21.2% per year, while Serbia recorded the worst performance at -20% per year.
Loading...
Date | Days |
---|---|
2019 | 110.20 |
2018 | 110.20 |
2017 | 110.20 |
2016 | 110.20 |
2015 | 110.20 |
Download all data from 2014 to 2019
How does Nigeria rank in Time Needed to Deal with Construction Permits?
# | 185 Countries | Days | Last | YoY | 5‑years CAGR | ||
---|---|---|---|---|---|---|---|
1 |
#1
Cambodia
|
652.00 | 2019 | +0.0 % | +0.0 % | View data | |
2 |
#2
Cyprus
|
507.00 | 2019 | +0.0 % | -5.6 % | View data | |
130 |
#130
Norway
|
110.50 | 2019 | +0.0 % | +0.0 % | View data | |
131 |
#131
Nigeria
|
110.20 | 2019 | +0.0 % | +0.0 % | View data | |
132 |
#132
Cabo Verde
|
108.00 | 2019 | +0.0 % | +0.0 % | View data |